Impact of Facility Bonds

The Impact of Facility Bonds at Our School

 

“Maximizing Achievement for All Students,” means making sure that every school, no matter when it was built, is a high-quality learning environment where students can do their best.

 

Over time, our school has benefited from community support of facility bond measures in many ways, allowing us to continue to have a modern, well-maintained campus equitable to other schools around Clovis Unified.

 

Since 2012, Alta Sierra Intermediate has received the following projects funded by two Measure A facility bonds:

  • Repaired and updated multipurpose room
  • Renovated pool, decking and equipment
  • Replaced roofing on various buildings
  • Repaired door hardware, casework, wall finishes, floor coverings
  • Implemented efficiency improvements in lighting
  • Implemented exterior lighting improvements
  • Repaired and upgraded main power distribution system
  • Upgraded technology network and wireless system
  • Added security cameras
  • Repaired and upgraded irrigation system, improved turf condition, drainage on play fields
  • Completed Americans with Disabilities Act (ADA) required upgrades

 

Every school facility in Clovis Unified has benefited from bond projects not once or twice, but many times over. Across the District, bond funds have been used for:

  • Fixing leaking roofs, electrical wiring, fire safety doors and smoke alarms
  • Repairing and upgrading deteriorating science, engineering and math classrooms to provide modern learning spaces at all of our schools
  • Building new schools and adding space at existing schools to reduce overcrowding
  • Building new performing arts and athletic spaces and upgrading others
  • Making needed updates to facilities to provide safe, clean drinking water
  • Improving school safety and security by updating communication systems and security systems
  • Maintaining equitable facilities at schools of all ages through modernization and maintenance projects
  • And many, many other upgrades and repairs

 

Many people don’t realize that as of 2024, our community has a lower tax rate on school bonds than it did in 2020, 2010 or even 2000. They also don’t know that Clovis Unified residents pay a lower tax rate than people living in neighboring school districts like Fresno, Sanger and Central. Learn more about our facilities program and the use of facility bonds in Clovis Unified at Facilities.

 

Measure A is on the November 2024 ballot. If passed, it will provide our school with:

  • Flooring in MPR
  • Replace Electrical
  • Roof Replacement
  • Safety Enhancements
  • AV Technology Improvements
  • LED Lighting Upgrades